Proposed permit issued by EPD, November 2008.
Ruling in the Tranquility case. Altamaha Riverkeeper had to defend standing (ability to bring a case). Judge ruled in favor of ARK finding that they did pass the 3 point test to have standing.
Application submitted by Power4Georgians to the Georgia Environmental Protection Division for groundwater withdrawals.
Title:
Plant Washington Stormwater Calculations
Summary:
Appendix G. Stormwater Calculations for proposed Plant Washington.
Title:
Plant Washington Antidegradation Report
Summary:
Appendix F. Antidegradation Report for Plant Washington.
Title:
Plant Washington CORMIX Modeling
Summary:
Appendix E. CORMIX Modeling for proposed Plant Washington
Title:
Plant Washington Conservation Plan
Summary:
Appendix D. Proposed water conservation plan for Plant Washington.
Title:
Plant Washington Groundwater Detail
Summary:
Appendix C. Groundwater report submitted by Power4Georgians.
Title:
Plant Washington Alternatives Analysis
Summary:
Alternatives Analysis (Appendix B) for Plant Washington submitted by Power4Georgians.
Title:
Plant Washington Oconee River Resources
Summary:
Appendix A for permit by Power4Georgians for Plant Washington near Sandersville. This appendix outlines the resources and impacts that the power company says there will be on the Oconee River.
Title:
Plant Washington Drinking Water Permit Application
Summary:
Drinking water permit application to the Georgia EPD by Power4Georgians.
Title:
Plant Washington Wellhead Protection Permit Application
Summary:
Application by Power4Georgians for groundwater wellhead protection permit from the Georgia EPD.
Title:
Plant Washington Groundwater Withdrawal Application
Summary:
Application by Power4Georgians to withdraw groundwater from wells in the Cretaceous aquifer (wells to be situated in the Oconee and Ogeechee watersheds). Application was submitted to Georgia EPD. Comment period closes in March 2008.
Title:
Plant Washington Surface Water Withdrawal Application
Summary:
Application by Power4Georgians to the Georgia EPD for surface water withdrawals from the Oconee River.
Title:
Plant Washington Water Discharge Application
Summary:
Application by Power4Georgians to the Georgia Environmental Protection Division for wastewater discharge permit to the Oconee River for Plant Washington, near Sandersville.
Summary:
Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.
Title:
Plant Washington Air Permit Application
Title:
Plant Washington Air Permit Application
Title:
Plant Washington Air Permit Application
Title:
Plant Washington Air Permit Application
Title:
Plant Washington Air Permit Application
Summary:
Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.
Summary:
Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.
Title:
Plant Washington Air Permit Application
Summary:
Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.
Title:
Plant Washington Air Permit Application
Title:
King Finishing Video
Title:
King Finishing Video
Title:
King Finishing Video
Title:
King Finishing Video
Summary:
August 4, 2007 footage of the King Finishing discharge pipe on the Ogeechee
Summary:
August 4, 2007 footage of the King Finishing discharge pipe on the Ogeechee


