Agency Issuance

Proposed permit issued by EPD, November 2008.

Ruling in the Tranquility case. Altamaha Riverkeeper had to defend standing (ability to bring a case). Judge ruled in favor of ARK finding that they did pass the 3 point test to have standing.

Application submitted by Power4Georgians to the Georgia Environmental Protection Division for groundwater withdrawals.

Title:

Plant Washington Stormwater Calculations

Summary:

Appendix G. Stormwater Calculations for proposed Plant Washington.

Title:

Plant Washington Antidegradation Report

Summary:

Appendix F. Antidegradation Report for Plant Washington.

Title:

Plant Washington CORMIX Modeling

Summary:

Appendix E. CORMIX Modeling for proposed Plant Washington

Title:

Plant Washington Conservation Plan

Summary:

Appendix D. Proposed water conservation plan for Plant Washington.

Title:

Plant Washington Groundwater Detail

Summary:

Appendix C. Groundwater report submitted by Power4Georgians.

Title:

Plant Washington Alternatives Analysis

Summary:

Alternatives Analysis (Appendix B) for Plant Washington submitted by Power4Georgians.

Title:

Plant Washington Oconee River Resources

Summary:

Appendix A for permit by Power4Georgians for Plant Washington near Sandersville. This appendix outlines the resources and impacts that the power company says there will be on the Oconee River.

Title:

Plant Washington Drinking Water Permit Application

Summary:

Drinking water permit application to the Georgia EPD by Power4Georgians.

Title:

Plant Washington Wellhead Protection Permit Application

Summary:

Application by Power4Georgians for groundwater wellhead protection permit from the Georgia EPD.

Title:

Plant Washington Groundwater Withdrawal Application

Summary:

Application by Power4Georgians to withdraw groundwater from wells in the Cretaceous aquifer (wells to be situated in the Oconee and Ogeechee watersheds). Application was submitted to Georgia EPD. Comment period closes in March 2008.

Title:

Plant Washington Surface Water Withdrawal Application

Summary:

Application by Power4Georgians to the Georgia EPD for surface water withdrawals from the Oconee River.

Title:

Plant Washington Water Discharge Application

Summary:

Application by Power4Georgians to the Georgia Environmental Protection Division for wastewater discharge permit to the Oconee River for Plant Washington, near Sandersville.

Summary:

Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.

Title:

Plant Washington Air Permit Application

Title:

Plant Washington Air Permit Application

Title:

Plant Washington Air Permit Application

Title:

Plant Washington Air Permit Application

Title:

Plant Washington Air Permit Application

Summary:

Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.

Summary:

Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.

Title:

Plant Washington Air Permit Application

Summary:

Materials submitted to Georgia EPD by the applicant, Power4Georgians, for the coal-fired plant near Sandersville, Plant Washington.

Title:

Plant Washington Air Permit Application

Title:

King Finishing Video

Title:

King Finishing Video

Title:

King Finishing Video

Title:

King Finishing Video

Summary:

August 4, 2007 footage of the King Finishing discharge pipe on the Ogeechee

Summary:

August 4, 2007 footage of the King Finishing discharge pipe on the Ogeechee